Our key expertise lies in providing planning and consultancy services in all aspects of construction. We have built up our experience over many years, particularly in the context of industrial buildings. When it comes to new developments, we offer a full range of services, ranging from support in the search for properties and overall planning activities and project management to the turnkey handover of the finished building.

Volkswagen Commercial Vehicles Wrzesnia, Polen

Volkswagen Commercial Vehicles Construction of new Crafter plant in Wrzesnia

As part of the general planning team, IC-L is fully responsible for the construction of the assembly hall, Finish, conveyor bridge and media centre throughout all stages defined by the HOAI specifications (structural and site / building planning).

Volkswagen Commercial Vehicles Construction of new Crafter plant in Wrzesnia, Poland

As part of the general planning team, IC-L is fully responsible for the construction of the assembly hall, Finish, conveyor bridge and media centre throughout all stages defined by the HOAI specifications (structural and site / building planning). IC-L has adhered to the unusually tight time frame of this €80 million project: construction work began just six months after the start of planning. After eight months, all buildings were completely weatherproof and installation and assembly work could begin.C-L was responsible for all aspects of structural and site planning for the construction of a new suction transfer press throughout all stages defined by the HOAI specifications – including the evaluation and analysis of the soundproofed foundation for the high-capacity press.

Leistungen_

SITE/ BUILDING PLANNING, STRUCTURAL PLANNING
Volkswagen Immobilien Open Hybrid LabFactory

Volkswagen Immobilien Open Hybrid LabFactory

With an investment sum of 30 million euros, a corporate and research centre was built near Volkswagen AG’s main plant.

Volkswagen Immobilien Open Hybrid LabFactory
Construction of a new company and research center

With an investment sum of 30 million euros, a corporate and research centre was built near Volkswagen AG’s main plant to develop and manufacture innovative lightweight components: the Open Hybrid LabFactory. It comprises an innovative five-storey building extending across an area of 10,000 m2. IC-L is supervising this pioneering project as general planner.

Leistungen_

GENERAL PLANNING
Volkswagen Construction of new car plant

Volkswagen Construction of new car plant

As general planner, IC-L was responsible for the construction of Volkswagen AG’s new car plant in Pune Chakan, India, with an investment volume of 250 million euros.

Construction of new car plant in Pune, India

As general planner, IC-L was responsible for the construction of Volkswagen AG’s new car plant in Pune Chakan, India, with an investment volume of 250 million euros. IC-L supervised the process through all stages from project planning and coordination to on-site management and the preparation of tender documents. Construction was completed after just 17 months.

Leistungen_

GENERAL PLANNING
N3 Engine Overhaul Services

N3 Engine Overhaul Services Special construction of engine test stand in Arnstadt

As architect and structural planner, IC-L was responsible for the world’s largest and most cutting-edge engine test stand, with an investment volume of 56 million euros.

N3 Engine Overhaul Services Special construction of one of the most modern engine test stands

As architect and structural planner, IC-L was responsible for the world’s largest and most cutting-edge engine test stand, with an investment volume of 56 million euros. In order to ensure the smooth running of the test stand, it had to meet extremely high requirements in terms of tolerance, components and emissions. The carefully soundproofed test stand enables tests and repairs of aircraft engines with a thrust of up to 150,000 lb.

Leistungen_

SITE PLANNING, STRUCTURAL PLANNING
Audi Györ Construction of new car plant

Construction of new car plant for AUDI AG in Györ, Hungary

Representing the client, AUDI AG Ingolstadt’s construction department, IC-L was on-site to manage building sections.

Audi Hungary Motor Kft
Construction of new car plant for AUDI AG in Györ, Hungary

Representing the client, AUDI AG Ingolstadt’s construction department, IC-L was on-site to manage building sections including the assembly hall with a logistics facility and the body shop with an office extension. The total area comprises almost 240,000 sqm with a total investment sum of 200 million euros.

Leistungen_

CLIENT REPRESENTATION
MTU Maintenance Belgrade, Serbia

MTU factory for repair and maintenance of engine parts

The Munich branch of IC-L with its planning offices was commissioned to carry out the site soil investigations, preliminary design, based on the User Requirements Specification (URS) provided by MTU incl. factory planning.

MTU factory for repair and maintenance of engine parts close to Belgrade in Serbia.

The Munich branch of IC-L with its planning offices was commissioned to carry out the site soil investigations preliminary design, based on the User Requirements Specification (URS) provided by the client incl. factory planning. The preliminary design of the building services was also coordinated by IC-L. The named services correspond to HOAI performance phase 1-3. Following the preliminary design, IC-L was involved in the tender process and clarified questions of the potential management contractor regarding the architecture and building services. The management contractor chosen by the client MTU has been assigned the detail design and construction under the design and build contract. In this phase, IC-L will undertake the architectural checking of the submitted detail design and will coordinate questions regarding the building services.

Leistungen_

Lead design (project planning, structural design, open air facilities, building services, fire protection, canteen design) for LP1-3 and 6+7
New Technology Centre

MAN New Technology Centre

In 2016, work began on the construction of a new technology centre for our client MAN.

MAN Technology Centre
New Technology Centre with various test benches

In 2016, work began on the construction of a new technology centre for our client MAN with the design of test benches among other things for engines, drive trains and components. This challenging project also included laboratories, workshops, social rooms, plants and offices. The project will be successfully completed and handed over to the client in 2020.

Leistungen_

Service phases 3-9
MTU Maintenance Langenhagen

Turbine test cell MTU Maintenance Langenhagen

As general planner, IC-L was responsible for the construction of a new turbine test cell at the MTU Maintenance site in Langenhagen, Germany.

MTU Maintenance Langenhagen
New and special construction of turbine test cell in Langenhagen

As general planner, IC-L was responsible for the construction of a new turbine test cell at the MTU Maintenance site in Langenhagen, Germany. The intense use of the cell and the resulting dynamic loads necessitated extremely high specifications in terms of tolerance, components (double-layer walls, 65 cm thick) and emissions. The investment sum was correspondingly high: 26 million euros.

Leistungen_

GENERAL PLANNING

Building Redevelopment

Building redevelopment represents a particular challenge for us as architects and engineers, as it involves converting buildings that have previously fulfilled a different function. We have planned, managed and successfully completed many such projects over the years. In every project, we attach particular importance to such aspects as quality, cost-effectiveness, and adherence to schedules, as well as ensuring that the transition from the building’s original function to its new one is smooth and seamless.

AUDI AG USB A2 and A3

Restructuring of the B-assemblies in hall A2 and A3

IC-L provides the complete structural and object planning for the rebuilding and renovation of the assembly halls A2 and A3 on AUDI's Ingolstadt facto...

AUDI AG USB Halle A2 and A3
Rebuilding and renovation of the assembly halls

IC-L provides the complete structural and object planning for the rebuilding and renovation of the assembly halls A2 and A3 on AUDI's Ingolstadt factory premises across all work phases of the HOAI.  In order to ensure the smooth production of the Audi models, which will continue throughout the entire conversion period, it is essential to adhere to and secure strictly timed schedules. To this end, very intensive coordination rounds were held with the users and the planners of the required conveyor and production technology. The necessary fire protection requirements also had to be adapted to the new floor space divisions and processes and integrated into the existing building.

Leistungen_

Project planning, structural design including the required site supervision, site logistics